Heartland Innovative Technology (HIT) Park

Want to learn more about Prince Edward County's Innovative Technology Park? Read below or download a brochure(PDF, 7MB) for more information.

Heartland Innovative Technology Park full-resolution brochure(PDF, 7MB)


Site Specifications

  • Site Size: 280+ Acres (with Expansion Possibilities)
  • Potential Build-out: Up to 1.3M+ SF
  • Zoning: C1 – Data Center By-Right
  • Electrical: Dominion Energy 230kV & 115kV Transmission On-Site with Large Scale Capacity
  • Current Dominion Energy Data Center Electric Rates as Low as $0.0475 / kWh with Qualifying Economic Development Incentives
  • Fiber: Open Access Fiber Backbone with MBC & Diverse Fiber Paths
  • Dark Fiber Connections to Primary Backbone Networks – SummitIG, Lumen Networks (formerly CenturyLink & Level3), Shentel & Comcast
  • Real Estate Tax Rate: $0.51 per $100 Assessed (Lowest 10% in Virginia)
  • Personal Property - Data Center Equipment Tax Rate: $1.00 per $100
  • Hotel Rooms: 500+ within 30 Minutes
  • Airports: Lynchburg Regional Airport Approx. 52 Miles/Charlottesville Albermarle Airport Approx. 60 Miles/Richmond International Airport Approx. 70 Miles/
  • Raleigh-Durham International Airport Approx. 125 Miles/Piedmont Triad International Airport Approx. 140 Miles
  • Water: Town of Farmville / Prince Edward County
  • Water Capacity: Water Infrastructure Extension Projects In Design Projecting Up to 1.2 MGD from Town of Farmville /Up to 5.5 MGD from Proposed Sandy River Reservoir
  • Educational: Longwood University Center for Cyber Security & Hampden-Sydney College Less Than 10 Minutes From Site
  • Incentives: Competitive Data Center Incentives for Lowest Total Cost of Ownership (TCO)
  • Within 2.0 Miles of Four-Lane US-460

Map of Planned Development Site

Heartland Innovative Technology Park Flyer


Contact

For further information, please contact:

Douglas P. Stanley, AICP ICMA-CM
County Administrator
Phone: 434.392.8837
Email: dstanley@co.prince-edward.va.us